Well Planning & Reporting Crossword Assignment

123456789101112131415161718192021222324252627282930
Across
  1. 2. Proper analysis of ____________ reflections can eliminate the wildcat status of a well.
  2. 4. Penetration rate, rotary torque and lithology are some drilling parameters located on _______ records
  3. 7. _______ program: A proposed or followed plan for the types of drilling fluids used in drilling a well with respect to depth
  4. 9. When selecting a rig, the rig must be properly rated for depth, pump and_________ capacity
  5. 15. The well plan and drilling operation that results in the lowest cost well meeting final construction specifications and safety to personnel is defined as _______________ drilling
  6. 18. Under which section of the well program can centralizer requirements be found
  7. 20. The ___________ curve is the experience gained in early high cost wells which permits savings on similar wells later
  8. 21. _________ sheets provide good offset information for cost estimates when planning a well.
  9. 23. The ‘elbow’ caused by a sharp change of direction in the wellbore
  10. 26. These wells often require more well planning than other types of wells
  11. 27. ____ pressures needed for fracture gradient prediction
  12. 28. Geological __________: section of the well program expected lithology sequence be found
  13. 29. Well __________:Starting point in data analysis trail
  14. 30. Bit selection, weight on bit and formation properties all affect the rate of__________
Down
  1. 1. The most significant factors affecting trip time include hole geometry and _________
  2. 3. Source of offset data showing structures
  3. 4. Drilling contractors can reduce drilling costs by __________ rotating time
  4. 5. the greatest maximum depth reached by the drill bit
  5. 6. When planning to drill a well, _____ and blowout prevention problems should be minimized
  6. 8. The purpose of a well plan is to make a ____________ hole at minimum cost
  7. 10. person responsible for Identifying geological anomalies
  8. 11. Trip sheets must be completed by the ____________ before each tripping operation
  9. 12. the gradient from the surface showing at what pressure a formation will open
  10. 13. meeting that is held before drilling begins
  11. 14. _________ records are excellent source of offset drilling information
  12. 16. Spring steel guides attached to casing and which serve to keep it centered in the open hole
  13. 17. Plan that comes after hole geometry selection
  14. 19. A type II well
  15. 22. The hole is sufficiently large so adequate completion can be made
  16. 24. An ______well is an existing wellbore that may be used as a guide for planning a well
  17. 25. person responsible for Identifying geological anomalies