Electrical Review

1234567891011121314151617181920
Across
  1. 4. A red light on a breaker indicates the breaker is shut and the _ is energized
  2. 7. The only turbine trip signal that immediately transfers 4kV buses to offsite is the _ trip
  3. 9. _ lighting panels use an ABT to maintain a power supply to lighting
  4. 10. a fault occurs on the DF bus, the #2 & 4 inverters are supplied from the _
  5. 12. Overcurrent and _ trip of supply breaker will prevent the cross-tie breaker from auto closing
  6. 14. #1 UPS is removed from service, SLVRT supplying #1 Vital Bus, the #1 Vital bus is _
  7. 16. The AK-50 breakers are mainly used as _ and cross-tie breakers
  8. 17. the _ of UPS converts 480VAC to 125VDC
  9. 18. the _ of the UPS converts 125 VDC to 120 VAC to supply the Vital Bus
  10. 19. 30 seconds after a Turbine Trip, not caused by an Electrical Fault, 4KV busses are powered from the _
  11. 20. 4KV brkr with a _ open indicating light, may be closed locally with the local CS on the breaker door
Down
  1. 1. 100% NSA, the voltage reading on DC bus #2 meter is being supplied from the _
  2. 2. Normal power supply to the #1 UPS is _ 480VAC
  3. 3. Transformers have _ gas pressure on the oil to prevent oxygen intrusion and corrosion
  4. 5. one inverter may be disconnected from its battery to perform an equalizing charge for < _ hrs.
  5. 6. 4kv auto bus transfer requires white neon light lit, k/s closed in breaker cubicle and _ _ (red targeted)
  6. 8. The control switch on the front door panel of a 4kV breaker always works with the breaker in the _ position
  7. 11. USST’s have a _ tap changer
  8. 13. Ensuring breakers are racked to Connect, Test, and Disconnect satisfies _ requirements
  9. 14. it is only possible to red target 4kv supply breaker without closing with the live bus transfer switch _
  10. 15. 100% Pwr Rx trip and OCB 83 fails open, FW-P-3B, Aux FW pump, is powered from the #2 _