S08-Machine Safety

123456789101112131415161718192021
Across
  1. 4. This type of interlock is used to physically block the machine's operation until its guards are in place
  2. 5. If an operator does not test equipment after it is locked out (2 words)
  3. 8. This person is responsible for reporting improperly guarded equipment or other safety concerns
  4. 9. This type of stop control is pushed in case of emergency to shut the whole machine down and override all other circuits in the system (2 words)
  5. 13. This should be done before removing machine guards.
  6. 16. An extra one of these can be added to a Lockout/Tagout if there are more locks than spaces
  7. 18. This organization has mandated, required safety procedures to make sure energized equipment is incapable of moving.
  8. 20. This type of PPE should be worn when using a drill press. (2words)
  9. 21. This type of restraint is a safety barrier that attaches to the employee and physically pulls them back and out of the way during dangerous processes.
Down
  1. 1. This is needed from the owner of a Lockout/Tagout if the person who performed it is no longer on the premises
  2. 2. This is the first step in the Lockout/Tagout process. (2 Words)
  3. 3. This is a device that is designed to keep the operator clear of dangerous machine parts.
  4. 6. The machines mechanical ____ prevents a machine's operation when the guard is out of place
  5. 7. Every employee who is servicing a machine should provide their own one of these to the hasp during the Lockout/Tagout Process
  6. 10. This person should be notified immediately if any employee knows a safety problem exists
  7. 11. This should be tied back to prevent it from getting stuck in machinery or caught on fire.
  8. 12. This type of restraint is a safety barrier that prevents an operator's arms from entering the machine during operation and getting crushed.
  9. 14. This should be close fitting to prevent from getting caught in machinery and prevent injury
  10. 15. If this has been done to a guard, a worker should immediately lockout a machine.
  11. 17. Before these can be removed, be sure to perform the Lockout/Tagout (2 words)
  12. 19. This is the last thing that needs to be done to the equipment in the Lockout/Tagout process.