General Knowledge

1234567891011121314151617181920212223242526272829303132333435363738394041424344
Across
  1. 5. The process we use to Control of Hazardous Energy (CoHE)
  2. 6. Japanese word for over-burden
  3. 8. The process of Continuous improvement
  4. 10. First measurable level in 3-pillar audit
  5. 11. Work the equipment must do (part of the 4m's)
  6. 12. Japanese word for uneven
  7. 13. Batteries come together to create a ____ (Last process of battery making)
  8. 18. Area where the jelly roll is inserted into the can
  9. 20. a serious or life-threating incident based on 6 categories and guidelines
  10. 21. The tool of built in quality "Left pillar of the TPS house"
  11. 23. Area where the battery is charged and tested for short circuits
  12. 28. The foundation of the TPS house
  13. 29. "I" in CHIPS
  14. 30. "C" in CHIPS
  15. 34. Keeping machines clean and area around (Step of 4s+s)
  16. 38. What we do at every intersection
  17. 39. What we do when an abnormality happens on the line
  18. 40. Overall goal of Toyota Production System "TPS"
  19. 41. _____ is our number one focus for everyone
  20. 42. Genchi-genbutsu means _____
  21. 44. Five___ is a process we use to come up with the root cause of a problem
Down
  1. 1. Second measurable level in 3-pillar audit
  2. 2. Sign to signal parts are needed
  3. 3. Last/best measurable level in 3-pillar audit
  4. 4. Method to organize the workplace
  5. 6. A workplace philosophy of showing care for others
  6. 7. Items worn for safety
  7. 9. First area in the battery making process
  8. 11. work suppliers must do to confirm the condition of their product part of the 4m's)
  9. 12. Japanese word for Waste
  10. 14. This is required in all stages of 4S
  11. 15. Acronym for 'Toyota production system'
  12. 16. Items that are needed only (Step of 4s+s)
  13. 17. Mistake proofing and/or Quality control Device (Japanese word)
  14. 19. a device that draws attention to abnormality in the production process
  15. 22. "P" in CHIPS
  16. 24. The work humans must do (part of the 4m's)
  17. 25. Acronym for Toyota Battery Manufacturing North Carolina
  18. 26. "S" in CHIPS
  19. 27. "Job Safety Analysis"
  20. 31. "H" in CHIPS
  21. 32. The work to ensure the condition of the product (part of the 4m's)
  22. 33. Toyota started out as a ___ Company
  23. 34. Systems to support and maintain area 4s (Step of 4s+s)
  24. 35. is a four step management method used for continuous improvement of processes and product (Acronym)
  25. 36. Tools and equipment as they are needed (Step of 4s+s)
  26. 37. "What is needed" "When is needed" are examples of this pillar of TPS house (Acronym)
  27. 43. Job instructions to make sure safety, quality, and productivity is achieved