Across
- 5. The process we use to Control of Hazardous Energy (CoHE)
- 6. Japanese word for over-burden
- 8. The process of Continuous improvement
- 10. First measurable level in 3-pillar audit
- 11. Work the equipment must do (part of the 4m's)
- 12. Japanese word for uneven
- 13. Batteries come together to create a ____ (Last process of battery making)
- 18. Area where the jelly roll is inserted into the can
- 20. a serious or life-threating incident based on 6 categories and guidelines
- 21. The tool of built in quality "Left pillar of the TPS house"
- 23. Area where the battery is charged and tested for short circuits
- 28. The foundation of the TPS house
- 29. "I" in CHIPS
- 30. "C" in CHIPS
- 34. Keeping machines clean and area around (Step of 4s+s)
- 38. What we do at every intersection
- 39. What we do when an abnormality happens on the line
- 40. Overall goal of Toyota Production System "TPS"
- 41. _____ is our number one focus for everyone
- 42. Genchi-genbutsu means _____
- 44. Five___ is a process we use to come up with the root cause of a problem
Down
- 1. Second measurable level in 3-pillar audit
- 2. Sign to signal parts are needed
- 3. Last/best measurable level in 3-pillar audit
- 4. Method to organize the workplace
- 6. A workplace philosophy of showing care for others
- 7. Items worn for safety
- 9. First area in the battery making process
- 11. work suppliers must do to confirm the condition of their product part of the 4m's)
- 12. Japanese word for Waste
- 14. This is required in all stages of 4S
- 15. Acronym for 'Toyota production system'
- 16. Items that are needed only (Step of 4s+s)
- 17. Mistake proofing and/or Quality control Device (Japanese word)
- 19. a device that draws attention to abnormality in the production process
- 22. "P" in CHIPS
- 24. The work humans must do (part of the 4m's)
- 25. Acronym for Toyota Battery Manufacturing North Carolina
- 26. "S" in CHIPS
- 27. "Job Safety Analysis"
- 31. "H" in CHIPS
- 32. The work to ensure the condition of the product (part of the 4m's)
- 33. Toyota started out as a ___ Company
- 34. Systems to support and maintain area 4s (Step of 4s+s)
- 35. is a four step management method used for continuous improvement of processes and product (Acronym)
- 36. Tools and equipment as they are needed (Step of 4s+s)
- 37. "What is needed" "When is needed" are examples of this pillar of TPS house (Acronym)
- 43. Job instructions to make sure safety, quality, and productivity is achieved