Across
- 6. ----------cycle can be considered as a project planning tool-(4)
- 8. A measurement system ability to detect a difference in the measuread charecteristic-(3)
- 10. The measurement error, when the indicator contact point is not parallel with the surface to be measured -(6)
- 11. Water vapour in the atmosphere air-(8)
- 12. Finding the actual size -(11)
- 13. The inspector walks around the shop floor-(6)
- 14. Name the principle, The measuring scale is in-line with the distance to be measured-(4)
- 15. Emptiness of space-(6)
Down
- 1. A situation in which something is not known(11)
- 2. Measures against the best-in-class practices (5-4)
- 3. The aspiration of the company in a short declaration-(6)
- 4. Method to perform rout cause analysis-(2)
- 5. A sequence of operations repeated regularly -(5)
- 7. Quality Gurus-(6)
- 9. Adherence to the legal and other requirements-(10)
