Across
- 2. to call or place tickets for IT
- 5. Document used to update EOL with new orders.
- 8. reminder to exhibitor to order/summit electrical orders.
- 11. required for refrigeration, computer systems, water pumps, ect.
- 17. when an order is not complete it goes into this phase.
- 19. Front face of the electrical department at showsite.
- 21. document that shows dribution.
- 24. Materials used to run power from the MDL.
- 26. order that is printed and given to electrician to perform job.
- 29. When orders are submitted on time.
- 30. used to install additional drops.
- 31. when an exhibitor is requesting to review of electrical bill
- 32. Received in South hall and C1, C2
- 34. installed in the back of inline/peninsula booths.
Down
- 1. equipment used to hang monitors 12ft or higher
- 3. always required for boothwork labor
- 4. process done to ensure all tickets are accounted for.
- 6. Plumbers for California/Dallas
- 7. when power comes from the ground.
- 9. the dismantle charges for the install
- 10. When exhibitor orders 208V or higher but no labor.
- 12. goes over exhibitors booth.
- 13. Website used to order services for the show
- 14. When show goes from pre-show to show-site
- 15. found in CORE to read correspondence between GES and Exhibitor
- 16. applied for 5 or more cords
- 18. used to communicate with exhibtors.
- 20. materials used for high voltage hook ups.
- 22. Conversations or emails between GES and Exhibitor
- 23. Plumbers for Las Vegas
- 25. is always updated when order goes from pending to complete.
- 27. Power is dropped from overhead from?
- 28. Left in Salesforce and sent to CORE.
- 33. used at showsite so cords don't move on the ground.
