Across
- 4. – Factory’s responsibility before dispatch.
- 6. – The “Bible” that guides the entire order.
- 7. – The system designed for cars up to 1200 kg.
- 8. – Electrical guardian for system protection.
- 9. – Annual service the society pays for.
- 11. – Key component used in VPP systems.
- 14. – The safety hero that prevents a drop.
- 17. – The interface between operator and machine.
- 18. – Type used in the 3TC system.
Down
- 1. – The client’s responsibility to prepare.
- 2. – Space meant for car movement and maneuvering.
- 3. – The final stage before completion.
- 5. – The very first step in every project.
- 7. – The part that does all the moving around.
- 10. – Our first installation this year in Mumbai.
- 12. – Cuts power when the system reaches its limit.
- 13. – The mechanical brain of the system.
- 15. – The electrical brain controlling the logic.
- 16. – The support sitting right below the platform.
