Across
- 3. A circuit breaker that has a slow response time due to old mechanical parts.
- 8. To reduce the stress on a heavily loaded transformer by diverting the current.
- 10. An engineer who can spot a micro-crack in an insulator before it causes a flashover.
- 11. A power grid designed to withstand and recover from a massive lightning strike.
- 13. A perfectly clear weather forecast on the day of a scheduled major outdoor cable pull.
- 14. Designing a system that minimizes energy waste and reduces operational costs.
- 15. A sudden realization of the root cause of a complex intermittent ground fault.
- 17. The level of detail needed when labeling thousands of wires in a control panel.
- 18. A safety record with zero LTI (Lost Time Injuries) over ten years of operation.
- 19. Being fully aware of the high-voltage risks and PPE requirements before entering a switchroom.
- 20. A senior engineer who shares his decades of technical 'secrets' with the junior staff.
Down
- 1. The dominance of one specific technology standard like AC over DC in global grids.
- 2. Making the wise decision to shut down a plant before an overheating motor fails.
- 4. Checking the torque on every single terminal bolt to ensure there are no loose connections.Exemplary A safety record with zero LTI (Lost Time Injuries) over ten years of operation.
- 5. A technician who communicates effectively with the entire team during a site shutdown.
- 6. The attitude required when performing high-voltage live-line maintenance.
- 7. An unstable power supply that fluctuates unpredictably and damages sensitive electronics.
- 9. Refusing to give up until the logic error in a complex PLC program is found and fixed.
- 12. Choosing a functional local spare part to restore power instead of waiting for a high-end import.
- 16. An inspector who judges a contractor's work strictly by the safety code without bias.
