Across
- 1. Learning ____ have access to a green room for video production in their renovated facility.
- 4. The Commodores’ school features a ______ theme.
- 7. This project features a flexible _____ allowing the space to be used for a variety of purposes.
- 8. This project combines ___ schools into one comprehensive facility.
- 9. Our team renovated an office building to provide a ___-____ solution for this project.
- 12. _______ plumbing and bricklaying are what makes this building an effective teaching tool.
- 14. _____ workstations at this instructional center allow for impromptu meetings with students.
- 15. This school system was designed to replace facilities damaged by ______ _______.
- 17. This project’s flexible environment features breakout rooms called ____ _____.
- 20. Along with a TV studio and control room, this project features a project room equipped with ______ tables.
- 21. Aggressive natural daylighting is just one of the ___-___ strategies employed in this project.
- 23. Outdoor ______ allow students at this middle school to monitor wildlife around their school.
- 24. Fanning Howey designed ____ new buildings for Olentangy Local Schools.
Down
- 2. This elementary school was named after a/an _______, and themed accordingly.
- 3. This project’s flex classrooms are grouped into ______ by operable walls.
- 5. In this project, our team used an existing _______ to create a helical wind turbine.
- 6. The concept of this project provides the District with ___-____ groupings, allowing students to learn at their own speed.
- 8. This project resulted in _____ LEED Gold certifications.
- 10. This project’s grand stair doubles as a/an _________.
- 11. This was the first ____ project funded through the OFCC.
- 13. This project provides a/an ____ _____ experience for high school seniors.
- 16. The ____ design is responsible for the speed of this pool.
- 18. This project involved _____ in the design of their school.
- 19. The corridor design of this project mimics the ____ fences surrounding the campus.
- 22. This project allows students to enjoy the outdoors with scenic _____ plazas.
