Across
- 3. Target time to restore a system after an outage
- 4. Walkthrough exercise to discuss DR steps without action
- 6. Average time between one failure and the next
- 8. Real-world test to confirm DR plan actually works
- 10. DR site with basic infrastructure but no equipment
Down
- 1. Fully operational DR site ready to take over immediately
- 2. High availability model where multiple systems run at once
- 3. Maximum acceptable amount of data loss measured in time
- 5. High availability model where one system waits on standby
- 7. Average time needed to repair a failed component
- 9. DR site with equipment but minimal configuration