Across
- 4. installation procedure in which the ground wire is installed between the grounding rod and the floating grounding bracket on the right side of the back plate assembly.
- 5. installation procedure where a section of earth is removed approximately 2" larger than the closure being placed and 16" deep
- 6. installation procedure remove the front covers of the CAD-6
- 7. terminal blocks are mounted through the front of the plate with studs and nuts and washers on the back
- 8. mount the back plate assembly to the stake
- 10. termination procedures where you sTrip 1 1/2" of insulation from each pair using snips
- 12. provides a means to secure the CAD-6 to a post, pole or wall
- 13. located on the lower front cover and allows the installation of buried service wires without removing the lower front cover
- 14. housing above ground splices, for load coils, and other equipment
- 15. facilitates placement of cable within the closure
Down
- 1. ensures sheath continuity if the closure is disturbed
- 2. protects the upper half of the CAD-6
- 3. used where buried splices are undesirable or impractical
- 9. installation procedure in which shield bond clamp and connect it to the floating bond arrangement
- 11. made of black polyethylene and attach to the back plate assembly