Block 4

123456789101112131415
Across
  1. 2. LZ's are normally marked with what marker panel?
  2. 3. LZ's can be comprised of Runway, apron, or ?
  3. 5. Referred to as the Box and One
  4. 6. Surface Length of runway plus 1,000ft width for C130 is 150ft
  5. 8. Amount of force modules
  6. 10. Outlines how a deployed or contingency airfield is opened and operated from start to finish
  7. 12. Can be installed and deployed on all types of surfaces(sand, frozen earth,ice,asphalt,etc)
  8. 13. Operational capabilities have been achieved and mission is being executed
  9. 15. Personnel with rank of E-5 or above
Down
  1. 1. unpaved surfaces composed of stabilized soils, matting, etc.
  2. 4. Which marking Panel layout is no longer used?
  3. 5. Force Module where an airfield is captured
  4. 7. Made of same material as LZ, 10ft wide
  5. 9. Highest number of aircraft capable of being on ground at same time is known as what?
  6. 11. Developed as base recovery after attack effort to allow launch and recovery of fighter aircraft
  7. 14. How many types of Landing Zone Surfaces are there
  8. 15. Qualified combat controller, provide air traffic control