Building Information Modelling 1

12345678910111213141516
Across
  1. 2. Fourth stage in the BIM process.
  2. 3. Third stage in the BIM process.
  3. 10. 'BIM' Full meaning(8,11,9)
  4. 13. The Bim level defined,when all parties use one shared 3D model, easily accessible to all(5,5)
  5. 15. First stage in the BIM process.
  6. 16. The BIM specification and logistic data allows for quick -------- --------- and risk mitigation( 8,9)
Down
  1. 1. From April 2016, what was made a mandatory requirement for all publicly tendered projects in the UK to operate at?(5,3,3)
  2. 4. Welsh word for 'design'
  3. 5. Capturing real world data of environments ensures accurate ------------ and collaboration.
  4. 6. Second stage in the BIM process.
  5. 7. Welsh word for 'building'
  6. 8. 'CDE' full meaning(6,4,11)
  7. 9. 3D model-based process to aid the design and construction of building projects( acronym)
  8. 11. Welsh word for 'modelling'
  9. 12. The Bim level defined by using 2D CAD for drafting production information(5,3)
  10. 14. Using the correct digital tools and technology together to design, analyse, construct and oporate the building asset is known as the --- -------- (3,8)