Across
- 2. Fourth stage in the BIM process.
- 3. Third stage in the BIM process.
- 10. 'BIM' Full meaning(8,11,9)
- 13. The Bim level defined,when all parties use one shared 3D model, easily accessible to all(5,5)
- 15. First stage in the BIM process.
- 16. The BIM specification and logistic data allows for quick -------- --------- and risk mitigation( 8,9)
Down
- 1. From April 2016, what was made a mandatory requirement for all publicly tendered projects in the UK to operate at?(5,3,3)
- 4. Welsh word for 'design'
- 5. Capturing real world data of environments ensures accurate ------------ and collaboration.
- 6. Second stage in the BIM process.
- 7. Welsh word for 'building'
- 8. 'CDE' full meaning(6,4,11)
- 9. 3D model-based process to aid the design and construction of building projects( acronym)
- 11. Welsh word for 'modelling'
- 12. The Bim level defined by using 2D CAD for drafting production information(5,3)
- 14. Using the correct digital tools and technology together to design, analyse, construct and oporate the building asset is known as the --- -------- (3,8)
