Across
- 2. Mutual Reserve _________ (MRA)
- 4. Firm Load Interruption is imminent or in progress; EEA level _______
- 5. Operating Reserve is comprised of contingency reserve, _________ reserve and load following.
- 7. High _____ state; the expectation of occurrence of some contingencies and the associated consequences requires operating in a more conservative manner.
- 9. Environmental _________ allows generators to produce greater amounts of electricity than would be possible under normal environmental constraints.
- 10. ______ load pick up
- 11. ____ emergency alert (EEA)
Down
- 1. A capacity ______occurs when there is an actual or forecasted shortage in the supply of energy to meet the system load, firm transactions and Operating Reserve commitments.
- 3. ______ Limit State; when firm load cannot be supplied within normal limits; operate to higher limits.
- 6. Aggressive load shedding can result in this condition.
- 8. _____ management procedures in effect in EEA level 2
