Capacity Deficiency 2022

1234567891011
Across
  1. 2. Mutual Reserve _________ (MRA)
  2. 4. Firm Load Interruption is imminent or in progress; EEA level _______
  3. 5. Operating Reserve is comprised of contingency reserve, _________ reserve and load following.
  4. 7. High _____ state; the expectation of occurrence of some contingencies and the associated consequences requires operating in a more conservative manner.
  5. 9. Environmental _________ allows generators to produce greater amounts of electricity than would be possible under normal environmental constraints.
  6. 10. ______ load pick up
  7. 11. ____ emergency alert (EEA)
Down
  1. 1. A capacity ______occurs when there is an actual or forecasted shortage in the supply of energy to meet the system load, firm transactions and Operating Reserve commitments.
  2. 3. ______ Limit State; when firm load cannot be supplied within normal limits; operate to higher limits.
  3. 6. Aggressive load shedding can result in this condition.
  4. 8. _____ management procedures in effect in EEA level 2