- 4. Hole Inspection n inspection performed by an engineer or municipal inspector to evaluate an open excavation and examine the earth to determine the type of foundation that should be installed in the hole
- 5. Chart a type of bar chart that illustrates a project schedule and shows the dependency relationships between activities and current schedule status.
- 6. Acceptance acceptance of the work as completed, including any deficiencies known to exist
- 7. base level of the building
- 10. contract an agreement between two or more parties to perform construction on a project according to certain terms and conditions.
- 11. Saw versatile saws used for cutting across (crosscut) and with (rip) the wood grain.
- 15. Tap a process usually reserved for the world of metals and plastics where a hole is drilled and a special cutter is used to create the appropriate threads.
- 16. someone who plans the form, look, or workings of something before it is being made
- 18. List part of the project closeout portion of the construction process in which a contractor prepares a document that lists any work that has not been completed, or not been completed correctly.
Down
- 1. (NTE) a cost- type contract where the contractor is compensated for actual costs incurred plus a fixed fee subject to a ceiling price.
- 2. to provide materials or labor to preform a service or do a job
- 3. Test a procedure performed to review water drainage in different soils.
- 8. a planned deviation between an exact dimension and a nominal or theoretical dimension
- 9. an acquired right of use over the property of another for the purposes of constructing highway related features outside City right of way limits
- 12. order an amendment to a construction contract that changes the contractor's scope of work
- 13. a power tool with a flat base and a rotating blade extending past the base.
- 14. and Materials Contract (T&M) used in construction when the project's scope isn't predetermined, making it difficult to agree on a fixed price and timeline for the contract.
- 17. Time the amount of time a task can be delayed without causing another task to be delayed or impacting the completion date of your project.
- 18. Survey a legal document that describes the physical limits of a property or a land plot and that contains a simple footprint of all buildings or buildings on the property.