- 3. Once jobs are identified, they are further divided into _______.
- 5. The point at which the title for the merchandise passes from the seller to the buyer is known as the ____ point.
- 6. The term commonly used to define the process of acquiring materials and other commodities for a project is ______.
- 8. When planning a project, the team should include all supervisory and appropriate _________ personnel responsible for carrying out the plan.
- 9. The document that organizes the project into detailed tasks and summary tasks is the work ______ structure.
- 10. The objective of a work analysis is to reduce ____ and cost to accomplish tasks.
Down
- 1. If material cannot be inspected at the time of receipt, the action that should be taken is to accept the material with the ______ of future inspection.
- 2. A general rule for breaking a project down into jobs and activities is that each activity should be identifiable and ________.
- 4. A good practice to ensure tool inventories are accurate is to use bar ______.
- 7. Every project consists of the same basic elements: goals and objectives; jobs composed of activities; sequence of activities; and _______ needed for the project.