Across
- 4. You can Prevent accidents from happening by doing what when you observe hazardous and unsafe behaviours?
- 6. Pins and needles could be a symptom of?(4)
- 7. Any crane lift is only permitted under what CPA Standard Conditions for what type of lift?(8)
- 10. Those wearing dust masks with a face seal should be?(5,6)
- 12. When should electrical survey works and validations be carried out in relation to other working progressing?(5)
- 14. With whom should you discuss high risk tasks such as welding, scaffolding or lifting operations as soon as possible?(3,4)
- 17. In regards to fire compartmentation any openings in floors, walls and ceiling need to be temporary fire stopped to what standard in relation to the rest of the areas?(10)
- 20. What should we be doing with our clients in regard to fire strategy and fire risk assessments?
- 23. What in addition to the maximum no. of sheets should be displayed on board trollies?(3)
- 24. What must be used and located near any welding process?
- 25. Name one place where temporary cables should be run?(4)
- 26. How many golden rules are there in the electrical policy?(12)
- 27. Where should you initially look to reduce dust being generated?(2,6)
- 28. Keeping a site …. will contribute to it being a safe site?(4)
Down
- 1. What is the lowest level of filter performance that must be used on the electrical dust extraction attached to all wood cutting equipment?(6)
- 2. If there are temporary works on site who must be appointed?(3)
- 3. How many times will the welfare be serviced to maintain a high standard of cleanliness?
- 5. Step ladders are only used as a last resort, justified under permit and in between should be kept?(6)
- 8. PPE will be worn at all times on site until?(2)
- 9. LPS1207 and TS63 are standards for temporary protection which are required as they tell us they are what?(8)
- 11. What is required to form a COSHH assessment?(4)
- 13. During the site set up, what activities should you be considering as there’s probably a lot of this to be carried out?(6,8)
- 15. Risk assessments and method statements from subcontractors should be ........ by Site Management before works proceed?(8)
- 16. Your duty is to………… the people under your control in all their activities and be mindful of their health safety and well-being of yourselves and those around you.(6)
- 18. If you are not a scaffolder are you allowed to alter a scaffold?(2)
- 19. We have standard designs available for what temporary cover?(5,5)
- 21. Forearm protection should be worn by specific trades and when working in specified areas but also whenever there is a? (4)
- 22. Portable electrical equipment will have a PAT (Portable Appliance Test) every …… months?
