- 3. Direct award of contract to the Contractor who have capabilities and experience after series of negotiation between Client and the Contractor is called ____________ tender
- 6. Concrete is a __________ material made from several readily available constituents (aggregates, sand, cement, water).
- 8. A type of curing method
- 10. Construction works above ground level
- 12. A process for concrete hardening by adding moisture to the concrete surface
- 13. An ___________ scaffold consists of a double row of standards, with each row parallel to the building.
- 14. These are lifting devices designed to raise materials by means of rope operation and move the load horizontally within their limitations of any particular machine.
- 16. Right to enter the Site, occupy and use the Site and carry out the specified Works is called site ___________
- 17. Dead load is the weight of the ___________ materials
- 18. Construction works below ground level
Down
- 1. __________ of concrete depends on water content, fineness of cement, and surface area of aggregates
- 2. Inviting offers from a limited number of registered Contractors, normally through Client’s personal contact, recommendation from Consultants or third parties known to the Client is called ______________ tender
- 4. ____________ is an element of risk
- 5. ____________ is a measure of the force per unit area (or force divided area)
- 7. Chemical added to speed up the hydration (hardening) of the concrete is called ____________
- 9. A _________ scaffold consists of a single row of standards, parallel to the face of the building and set as far away from it as is necessary to accommodate a platform of four or five boards wide, with the inner edge of the platform as close to the wall as is practicable.
- 11. Process of selecting a suitable and qualified Contractor for the project
- 15. _____________ loads are those loads due to temperature changes, construction eccentricities, shrinkage of structural materials, settlement of foundations, or other such loads