Across
- 2. Makes the current condition accessible and clear.
- 6. Signal cards used to regulate flow of materials.
- 7. Waste. Anything that does not add value.
- 8. The real place where work is done.
- 12. The pace of production based on customer demand.
- 14. Used to align the goals of the company.
- 17. An iterative methodology for implementing improvements.
- 18. Error detection and prevention method.
- 20. The cleaning step of the 5S process.
Down
- 1. Procedures that capture best practices.
- 3. Number of big losses most universally experienced in manufacturing.
- 4. Signal that assistance is needed.
- 5. Measureable that captures availability, performance, and quality metrics.
- 9. Part of the process that is limiting overall throughput.
- 10. Type of goal that is specific, measurable, attainable, relevant, and time-specific.
- 11. Work smoothly flowing through production.
- 13. Employee working together to achieve improvement.
- 15. Single Minute Exchange of Dies.
- 16. _____ stream maps are used to visually show the flow of production.
- 17. The P in TPM. Total __________ Maintenance.
- 19. Key performance indicators
