Continuous Improvement

1234567891011121314151617181920
Across
  1. 2. Makes the current condition accessible and clear.
  2. 6. Signal cards used to regulate flow of materials.
  3. 7. Waste. Anything that does not add value.
  4. 8. The real place where work is done.
  5. 12. The pace of production based on customer demand.
  6. 14. Used to align the goals of the company.
  7. 17. An iterative methodology for implementing improvements.
  8. 18. Error detection and prevention method.
  9. 20. The cleaning step of the 5S process.
Down
  1. 1. Procedures that capture best practices.
  2. 3. Number of big losses most universally experienced in manufacturing.
  3. 4. Signal that assistance is needed.
  4. 5. Measureable that captures availability, performance, and quality metrics.
  5. 9. Part of the process that is limiting overall throughput.
  6. 10. Type of goal that is specific, measurable, attainable, relevant, and time-specific.
  7. 11. Work smoothly flowing through production.
  8. 13. Employee working together to achieve improvement.
  9. 15. Single Minute Exchange of Dies.
  10. 16. _____ stream maps are used to visually show the flow of production.
  11. 17. The P in TPM. Total __________ Maintenance.
  12. 19. Key performance indicators