Across
- 3. The leading cause of injuries in the IT Sector is from ________.
- 8. Coaxial cable has a pull force of ________ ________ lbs.
- 9. If Ethernet cabling must cross a ________-________ line, do so at a 90 degree angle.
- 11. It is not ok to take ________ when installing a cabling system, even if your safe.
- 12. When climbing a ladder, maintain ________ points of contact.
- 15. If your not 100% positive of the status of an electrical circuit, assume it is ________.
- 17. During the ________-________ stage, cables and installed materials must be protected from paint and sheetrock mud.
- 18. You should always wear the proper ________ when it is needed.
- 19. During the ________ phase, the technician gets/verifies equipment, verifies job requirements and proceeds to the installation site.
- 21. The mission of ________ is to assure the safety and health of America’s workers.
- 22. During the ________-________ phase of installation is when jacks are terminated.
- 24. Local codes can only add to the NEC and make it more ________.
- 27. Cables should be ________ as to where they are connected and where they are going.
- 28. The ________ stage is when a technician determines the customer’s needs and does a walkthrough.
- 29. When installing any kind of specialty system, make sure you ________ the customer.
- 30. The ________ _________ for a U/UTP cable is 4 times the diameter.
- 32. Electrical ________ happens when a person becomes part of a circuit.
- 33. You must not tie two ________ together to make them longer.
- 34. Data cable has a pull force of ________ ________ lbs,
Down
- 1. You should report an injury ________.
- 2. When working in ________ ________ ________, you should make every effort not to impact customers, this means asking before moving desks and equipment or disconnecting phones.
- 4. Unlike the NEC, ________ are not mandatory, but should be followed.
- 5. ________ recommend 10 feet of extra cable in the TR and 12 inches at the outlet.
- 6. Anytime a wall or ceiling is opened for cable penetration, ________ ________ ________ must be used to fill all holes and gaps.
- 7. The ANSI/TIA 570 standard covers ________ telecommunications cabling.
- 10. Shutting off and ________-________ the source of the electricity before working on or around an electrical circuit is one of the most important protocols.
- 13. ________ an exsisting structure requires a great deal of planning over new construction.
- 14. Maximum cable length is 100 ________.
- 16. The ________ phase is broken into two steps, first is Rough-In, then Trim-Out.
- 20. When working with an ________ ________, the ratio of the height to the distance from the wall is 4:1.
- 23. Extra cable that is used for later termination?
- 25. Must, Shall, and Will are all ________ terms
- 26. Following the ________ is mandatory, as it provides safety when dealing with electrical equipment.
- 31. Can, May, and Should are all ________ terms