Copper Module 8

12345678910111213141516171819202122232425262728293031323334
Across
  1. 3. The leading cause of injuries in the IT Sector is from ________.
  2. 8. Coaxial cable has a pull force of ________ ________ lbs.
  3. 9. If Ethernet cabling must cross a ________-________ line, do so at a 90 degree angle.
  4. 11. It is not ok to take ________ when installing a cabling system, even if your safe.
  5. 12. When climbing a ladder, maintain ________ points of contact.
  6. 15. If your not 100% positive of the status of an electrical circuit, assume it is ________.
  7. 17. During the ________-________ stage, cables and installed materials must be protected from paint and sheetrock mud.
  8. 18. You should always wear the proper ________ when it is needed.
  9. 19. During the ________ phase, the technician gets/verifies equipment, verifies job requirements and proceeds to the installation site.
  10. 21. The mission of ________ is to assure the safety and health of America’s workers.
  11. 22. During the ________-________ phase of installation is when jacks are terminated.
  12. 24. Local codes can only add to the NEC and make it more ________.
  13. 27. Cables should be ________ as to where they are connected and where they are going.
  14. 28. The ________ stage is when a technician determines the customer’s needs and does a walkthrough.
  15. 29. When installing any kind of specialty system, make sure you ________ the customer.
  16. 30. The ________ _________ for a U/UTP cable is 4 times the diameter.
  17. 32. Electrical ________ happens when a person becomes part of a circuit.
  18. 33. You must not tie two ________ together to make them longer.
  19. 34. Data cable has a pull force of ________ ________ lbs,
Down
  1. 1. You should report an injury ________.
  2. 2. When working in ________ ________ ________, you should make every effort not to impact customers, this means asking before moving desks and equipment or disconnecting phones.
  3. 4. Unlike the NEC, ________ are not mandatory, but should be followed.
  4. 5. ________ recommend 10 feet of extra cable in the TR and 12 inches at the outlet.
  5. 6. Anytime a wall or ceiling is opened for cable penetration, ________ ________ ________ must be used to fill all holes and gaps.
  6. 7. The ANSI/TIA 570 standard covers ________ telecommunications cabling.
  7. 10. Shutting off and ________-________ the source of the electricity before working on or around an electrical circuit is one of the most important protocols.
  8. 13. ________ an exsisting structure requires a great deal of planning over new construction.
  9. 14. Maximum cable length is 100 ________.
  10. 16. The ________ phase is broken into two steps, first is Rough-In, then Trim-Out.
  11. 20. When working with an ________ ________, the ratio of the height to the distance from the wall is 4:1.
  12. 23. Extra cable that is used for later termination?
  13. 25. Must, Shall, and Will are all ________ terms
  14. 26. Following the ________ is mandatory, as it provides safety when dealing with electrical equipment.
  15. 31. Can, May, and Should are all ________ terms