- 4. A key health and safety risk associated with working at heights over two metres
- 6. (2 words) A power saw used in demolition work
- 7. (2 words) This is what should happen for all service lines before demonstration begins
- 8. In case of later complaints or claims, it a good idea to take these of the neighbouring buildings, before demolition work begins
- 10. A digging and earth-moving machine used in demolition work
- 12. A heavy hammer used in demolition work
- 13. An acronym for the document required for high-risk demolition work
- 16. (2 words) When a wall or beam is supporting much of the weight of the overlying parts of the structure
- 18. Produces the Safety Data Sheet with information about hazards and safety precautions for specific substances
- 20. It is professional and courteous to advise them that demolition will take place
- 21. This professional should be consulted to first identify load-bearing structures
- 23. A hazardous material associated with homes built prior up to the 1980s
Down
- 1. (3 words) A key health and safety risk in which someone could get crushed
- 2. (2 words) The risk level for much demonstration work
- 3. (2 words) A no-go area
- 5. (2 words) A pneumatic power tool that combines a hammer and chisel, which is used to break up concrete
- 9. (2 words) A key health and safety risk in which someone could get hit by items from above
- 11. (2 words) A power saw in which the cutting action is achieved through a push-and-pull motion of the blade
- 14. (2 words) Use this to pry timber members from the structure
- 15. One of the two variables shown on a risk assessment matrix
- 16. One of the two variables shown on a risk assessment matrix
- 17. A horizontal support of timber, stone, concrete, or steel across the top of a door or window
- 19. (3 words) A phone line service established to advise the builder of the location of electric, gas, water and sewerage lines
- 22. An environmental issue caused by the use of power tools used in demolition work