Across
- 2. Part of 6M root cause analysis (7)
- 5. Quality: “fitness for use” (5)
- 6. Third phase in 5S (5)
- 7. Symbol - (Black star) in engineering drawing specifies ____ (6_6)
- 8. Labeling unneeded items for removal from a production or indicate as rejection (3-3)
- 10. Parts which have not completed entire production or test flow but represented as completed (11)
- 12. Symbol denotes - (8)
- 13. A validation process, Comparison with Known measurements(11)
Down
- 1. Finding the size (11)
- 3. Mistake proofing is also known as ____ (4-4)
- 4. Goods in stock (9)
- 6. It is a Method to segregate the Good and Bad products from the batch (9)
- 9. Acronym for cost related to failure or defects (4)
- 11. Japanese term - change for the better (6)
