crossword puzzle

12345678910111213
Across
  1. 2. Part of 6M root cause analysis (7)
  2. 5. Quality: “fitness for use” (5)
  3. 6. Third phase in 5S (5)
  4. 7. Symbol - (Black star) in engineering drawing specifies ____ (6_6)
  5. 8. Labeling unneeded items for removal from a production or indicate as rejection (3-3)
  6. 10. Parts which have not completed entire production or test flow but represented as completed (11)
  7. 12. Symbol denotes - (8)
  8. 13. A validation process, Comparison with Known measurements(11)
Down
  1. 1. Finding the size (11)
  2. 3. Mistake proofing is also known as ____ (4-4)
  3. 4. Goods in stock (9)
  4. 6. It is a Method to segregate the Good and Bad products from the batch (9)
  5. 9. Acronym for cost related to failure or defects (4)
  6. 11. Japanese term - change for the better (6)