Electrical 1 – Orientation to the Trade

1234567891011121314
Across
  1. 3. Industrial electricians would most likely require special knowledge of ________ locations.
  2. 4. A residential wiring system typically uses ________ sheathed cable.
  3. 7. Industrial electricians may be responsible for wiring ________ instrumentation.
  4. 8. A nail-on box is a component of a _______ wiring system.
  5. 9. Interior panels in residential wiring are typically installed during the _________?
  6. 10. The electrical field can be divided into _______ categories.
  7. 12. Distribution switchgear is a component of a __________ wiring system.
  8. 14. Individuals responsible for filing their own taxes and providing their own insurance.
Down
  1. 1. Electrical contractors work as _______ for a general contractor.
  2. 2. A fire alarm system is a component of a __________ wiring system.
  3. 5. Commercial wiring is typically installed in __________ raceways.
  4. 6. Electrical _______ personnel must be able to repair the components associated with magnetic motor starters.
  5. 11. The termination of devices and fixtures is completed during a construction phase known as ______?
  6. 13. Conduit systems in a volatile environment must be _________ to outside vapors and gasses.