Across
- 3. the required overhead service drop clearance over a driveway
- 5. these provide service to remote panels
- 9. the neutral wire is what kind of conductor?
- 10. the rate at which work is done
- 11. to connect metal parts of a system so there is no potential difference between them is called _______
- 12. what is the maxiumum number of movements to shut off the panel?
- 15. a concrete encased grounding electrode
- 17. gfci's are required within how many feet of water
- 18. another term for a grounding rod is a grounding______
- 20. the required clearance for an overhead service drop over a deck is how many feet up?
- 21. wires to outlets are called _____ conductors
- 22. the required clearance for an overhead service drop over a deck is how many feet out?
Down
- 1. a unit of electromotive force
- 2. the final termination that is not a fixed appliance - example? outlet, lighting fixture, switch
- 4. the proper term for an underground service drop is a service _______
- 6. the main panel is also referred to as the _____ panel
- 7. the name for the end of the utilities distribution chain before it goes to the home
- 8. a direct connection to the earth
- 13. how many feet over a road is the required overhead power clearance
- 14. the proper term for a wire
- 15. a hot or live wire is what type of conductor?
- 16. what term describes the opposition to an electric current
- 19. the required overhead feeder clearance above a flat roofed garage
- 21. bundles of insulated wire sheathed in a very sturdy metallic spiral armor that acts as the ground