Across
  1. 3. the required overhead service drop clearance over a driveway
  2. 5. these provide service to remote panels
  3. 9. the neutral wire is what kind of conductor?
  4. 10. the rate at which work is done
  5. 11. to connect metal parts of a system so there is no potential difference between them is called _______
  6. 12. what is the maxiumum number of movements to shut off the panel?
  7. 15. a concrete encased grounding electrode
  8. 17. gfci's are required within how many feet of water
  9. 18. another term for a grounding rod is a grounding______
  10. 20. the required clearance for an overhead service drop over a deck is how many feet up?
  11. 21. wires to outlets are called _____ conductors
  12. 22. the required clearance for an overhead service drop over a deck is how many feet out?
Down
  1. 1. a unit of electromotive force
  2. 2. the final termination that is not a fixed appliance - example? outlet, lighting fixture, switch
  3. 4. the proper term for an underground service drop is a service _______
  4. 6. the main panel is also referred to as the _____ panel
  5. 7. the name for the end of the utilities distribution chain before it goes to the home
  6. 8. a direct connection to the earth
  7. 13. how many feet over a road is the required overhead power clearance
  8. 14. the proper term for a wire
  9. 15. a hot or live wire is what type of conductor?
  10. 16. what term describes the opposition to an electric current
  11. 19. the required overhead feeder clearance above a flat roofed garage
  12. 21. bundles of insulated wire sheathed in a very sturdy metallic spiral armor that acts as the ground