Across
- 2. Some of the job i.e. excavation, confined space, electrical, lifting and road obstruction required ________ as support documents for Permit to Work.
- 4. Snakes, bees, wasp, lizards and bacteria are the example of _______ hazards
- 5. There are two (2) types of permit to work which are ______ work & hot Work Permit.
- 7. How many employees (minimum) in a company required by Law for the establishment of Health and Safety Committee?
- 9. how many elements in PETRONAS HSE Management System?
- 10. An unplanned event or chain of events, which has, or could have caused injury or illness and/or damage (loss) to people, assets, the environment or reputation
- 12. Energy source (e.g. electrical, mechanical, hydraulic, pneumatic, chemical, thermal) is the example of_______
- 15. Permit to work is not required for this type of job
- 16. Zeto Rules #8, do not position yourself under a ______ load
- 17. __________ Authority is personnel who received the approved job.
Down
- 1. ___________ Authority is responsible to approve the Permit to Work
- 3. vessels, sump pit, silo and tanks are the example of_______ spaces.
- 6. HSE KPIs are divided in to two (2) which are leading and ______ KPIs
- 8. probability x consequences = ______
- 11. Emergency are categorised in to _____ tiers
- 12. Compulsory to wear for working at height job for 2 metres and above.
- 13. personnel who certified to conducted gas testing
- 14. A doctor advise the mechanical technician to perform a light duty office job after been involved in road accident. This accident is categories as ________ work case.
- 18. who is the incident commander during tier 2 emergency
