Integra Crossword B

1234567891011121314151617
Across
  1. 1. The bake removes moisture before storage or shipment.
  2. 4. Included in shipment that reference ship to customer, customer P.O. #, internal S.O., routing instructions, shiip to and bill to addresses, and product description and quality.
  3. 7. Material supplied by the customer.
  4. 9. Foundational document provided by the customer that defines the projects requirements.
  5. 10. A test or series of tests used to determine the sum of external influences affecting the structural, mechanical, and functional integrity of any given package or assembly.
  6. 11. A very stringent, exactly defined military specification that defines the test method and defect criteria for assembly of IC's.
  7. 12. Changes in the scope of work.
  8. 13. Notes provided to the Shipping Department indicating specific instructions from the customer pertaining to how the devices should be shipped.
  9. 15. An individual integrated circuit or discrete device.
  10. 16. A notch or dot on a device that means how to insert the device in the socket.
  11. 17. The objective of this test is to determine the ability of the package to withstand rapid changes of temperature within an air environment.
Down
  1. 2. The purpose of this test is to measure bond strength.
  2. 3. A problem occurs in the process of testing a device Lot, which prevents the completion of the lot testing, or if an unexpected fail rate of greater than 10% occurs.
  3. 5. If a revised customer specification, SOW or document is received, customer service will verify if review by configuration management is required.
  4. 6. A set of step-by-step instructions complied by Integra to help employees carry out complex routine operations.
  5. 7. The duration from the start of the new load to the start of the next new load.
  6. 8. Devices that no longer meet the customer's or manufacturer's physical requirements.
  7. 14. A method of packing devices prior to shipment.