Across
- 3. The amount of time whereby a successor activity is required to be delayed with respect to a predecessor activity
- 5. within the limits that define acceptable variation for a quality requirement
- 6. A system of practices, techniques, procedures, and rules used by those who work in a discipline
- 8. A management control point where scope, budget, actual cost, and schedule are integrated and compared to earned value for performance measurement
- 11. distribution
- 12. A special form of bar chart used to describe the central tendency, dispersion, and shape of a
- 13. A technique used to shorten the schedule duration for the least incremental cost by adding
Down
- 1. Examining or measuring to verify whether an activity, component, product, result, or service conforms to specified requirements
- 2. The approved version of a work product that can be changed only through formal change control procedures and is used as a basis for comparison
- 4. Within the quality management system, a general concept of delivering results that
- 7. A critical path method technique for calculating the late start and late finish dates by working backward through the schedule model from the project end date
- 9. from a similar activity or project
- 10. A technique for estimating the duration or cost of an activity or a project using historical