Across
- 2. An integrative philosophy of management for continuous product and process improvement
- 5. This man is credited with mastering the assembly line
- 6. Production scheduling tool to minimize total holding and ordering cost
- 8. What is the 5th 'S' in 5S
- 9. A chain is only as strong as its weakest link- acronym of a theory which exemplifies this
- 11. Prize given to quality
- 12. The beer distribution game of MIT Sloan School of Management best simulates this well known effect observed in forecast driven distribution channels
- 14. This technique decides the lot size and schedule when several products need to be produced on the same machine. What is the acronym?
- 15. Rapid improvement in a limited process area
- 17. Japanese term meaning 'Evening out'
- 18. If a customer wants to buy 6 units, average time to build a unit must be 6 hours in a 36 hour week. This average time is called ---- TIME?
Down
- 1. Strategy developed after World War 2 to help rebuild economy through better manufacturing technique
- 3. In April 2013, Flipkart made a shift to this inventory model
- 4. Logistics practice which eliminates storage when merchandise is received as it directly readies it for the next shipment
- 7. Mechanism which operates triggers to balance the actual consumption with the inventory level
- 10. Systematic design tool to analyze failure (Hint: designed by the US Army)
- 13. Method which helps eliminate human error
- 16. Quality at source-derived from TPS