- 7. The sum of all the times during which a work item is actively being worked on excluding wait times
- 10. The point in a kanban system at which the commitment is made to deliver a work item
- 11. A visual display of the cards in a system
Down
- 1. A policy that constrains the amount of WiP allowed in a given part of the system
- 2. the point at which an item is considered to be delivered or complete
- 3. The act of populating the input queue for a service.
- 4. The ratio of the time spent working on an item (Touch Time) to the total Time in Process
- 5. The number of work items exiting a system or sub- system per unit of time
- 6. The time it takes for a work item to move through the system from the commitment point to the delivery point
- 8. A chart showing the cumulative number of arrivals and departures from a process, or parts of a process, over a time period (Abreviation)
- 9. A process where the Kanban Method is being applied, but which does not yet show characteristics of a mature system; for example without WIP Limits.