Across
- 2. Grinding away on some pipe? Better be wearing this PPE (in addition to safety glasses)!
- 4. This high-risk task requires performance of duties on or near exposed energized systems of 50 volts AC/DC or greater.
- 7. While completing overhead work, it’s much more effective to _____your tools instead of yelling “Look out below!”
- 10. _____ point capacity must be greater than 5,000 pounds when working at heights. That’s about the weight of a Volkswagen Bug!
- 12. Your team members need to use a forklift in a crowded workspace. Better make sure you have at least one _____or flagger.
- 16. When completing chemical work, it’s not enough to just have the SDS available, make sure that you actually _____ it!
- 18. Before entering a confined space, ensure that an _____ is present and communication is established.
- 20. The first hierarchy of control is _____. If you don’t have to perform a high-risk task, you’ve avoided the risk!
Down
- 1. _____ must be physically marked before performing a line break.
- 3. Although it’s often the first thing we reach for, PPE should be used as the _____ line of defense.
- 5. Anytime we’re working on industrial machines/rotating equipment, all pinch points and caught-in-between areas must be _____.
- 6. Use as many controls as are reasonable for the work you’re performing, which creates layers of _____that help avoid injuries/incidents.
- 8. When handling heavy materials, one person should never lift more than _____pounds alone. Instead, team lift or use a mechanical device. Heroes don’t risk hernias.
- 9. When temperatures reach _____degrees, you must have a heat stress management plan in place.
- 11. Every work area must be clean/clear of open holes and _____.
- 13. You’re completing a demolition job. You must have a plan to control the _____ for falling/unsecured material.
- 14. _____ controls, such as LOTO or machine guards, physically reduce the risk of harm.
- 15. When completing the PTP for fire and hot work, make sure you specify that gas cylinders are separated and _____.
- 17. While working with cranes/hoisting/rigging, ensure the _____ of the load is known (no guessing!).
- 19. Team members working in an excavation/trench must have a safe point of egress within _____ feet.