Keeping people safe

1234567891011121314151617181920
Across
  1. 2. Grinding away on some pipe? Better be wearing this PPE (in addition to safety glasses)!
  2. 4. This high-risk task requires performance of duties on or near exposed energized systems of 50 volts AC/DC or greater.
  3. 7. While completing overhead work, it’s much more effective to _____your tools instead of yelling “Look out below!”
  4. 10. _____ point capacity must be greater than 5,000 pounds when working at heights. That’s about the weight of a Volkswagen Bug!
  5. 12. Your team members need to use a forklift in a crowded workspace. Better make sure you have at least one _____or flagger.
  6. 16. When completing chemical work, it’s not enough to just have the SDS available, make sure that you actually _____ it!
  7. 18. Before entering a confined space, ensure that an _____ is present and communication is established.
  8. 20. The first hierarchy of control is _____. If you don’t have to perform a high-risk task, you’ve avoided the risk!
Down
  1. 1. _____ must be physically marked before performing a line break.
  2. 3. Although it’s often the first thing we reach for, PPE should be used as the _____ line of defense.
  3. 5. Anytime we’re working on industrial machines/rotating equipment, all pinch points and caught-in-between areas must be _____.
  4. 6. Use as many controls as are reasonable for the work you’re performing, which creates layers of _____that help avoid injuries/incidents.
  5. 8. When handling heavy materials, one person should never lift more than _____pounds alone. Instead, team lift or use a mechanical device. Heroes don’t risk hernias.
  6. 9. When temperatures reach _____degrees, you must have a heat stress management plan in place.
  7. 11. Every work area must be clean/clear of open holes and _____.
  8. 13. You’re completing a demolition job. You must have a plan to control the _____ for falling/unsecured material.
  9. 14. _____ controls, such as LOTO or machine guards, physically reduce the risk of harm.
  10. 15. When completing the PTP for fire and hot work, make sure you specify that gas cylinders are separated and _____.
  11. 17. While working with cranes/hoisting/rigging, ensure the _____ of the load is known (no guessing!).
  12. 19. Team members working in an excavation/trench must have a safe point of egress within _____ feet.