Across
- 1. distribution built on sub transmission structures
- 4. two phases and neutral (used for Light 3-phase loads)
- 6. pole at which conductors transition from overhead to underground
- 7. Pole to Pole
- 9. burn open to protect transformers in case of a fault
- 10. Circuit with at least two phases and no neutral
Down
- 2. 4 times more $$$ than overhead construction
- 3. Circuit with at least one phase and a neutral
- 5. Pole to consumer
- 8. renergize conductors up to 4 times in case of a fault
