NFPA 70E

12345678910111213141516171819
Across
  1. 4. First step of creating an Electrically Safe Work Condition
  2. 7. Third step of creating an Electrically Safe Work Condition
  3. 9. Testing, troubleshooting, or voltage measuring are considered _______ to the Energized Electrical Work Permit
  4. 10. Occupational Health and Safety Admistration
  5. 11. Limited Approach Boundary of a 480V system (__ft __in)
  6. 12. National Fire Protection Association
  7. 13. A source of possible injury associated with the release of energy caused by an electric arc
  8. 15. Fourth step of creating an Electrically Safe Work Condition
  9. 16. An approach boundary which unqualified persons should rarely cross
  10. 17. A dangerous condition that can result in electric shock, arc flash burns, thermal burns, or arc blast injury
  11. 19. An approach boundary where there is an increased likelihood of electric shock
Down
  1. 1. Party responsible for using PPE
  2. 2. Use an adequately rated portable test instrument to test each ________
  3. 3. Personal Protective Equipment
  4. 5. A source of possible injury associated with current through the body
  5. 6. Party responsible for providing PPE
  6. 8. Unit of Measurement of Incident Energy ____ per centimeter squared
  7. 9. Equipment should be made ______ safe prior to undertaking work
  8. 11. A qualified person shall be _____ and knowledgeable in the construction & operation of equipment
  9. 14. Second step of creating an Electrically Safe Work Condition
  10. 18. The combination of likelihood something will happen and the severity associated with the hazard