Across
- 2. Test and Inspection Plan — A comprehensive, contractor-generated plan detailing all required quality checkpoints, testing milestones, and oversight requirements.
- 4. Condition Found Report — A formal report generated by the contractor in NMD to document unexpected shipboard deficiencies, damage, or interferences.
- 7. A highly structured, legally binding technical document that translates raw ship maintenance needs into precise, contractually sound engineering requirements.
- 8. An administrative correction or minor technical change issued to modify a published package in NMD before the contract is formally awarded.
Down
- 1. Often used interchangeably with or containing the data of a 2-Kilo (2-K)—is the fundamental initiating document used to identify, request, and track maintenance actions.
- 3. The preliminary quality control check where the planning activity reviews a drafted specification in NMD for technical accuracy before releasing it.
- 5. The formal review process where outside stakeholders (e.g., Ship's Force, Type Commander, or Technical Authorities) review and approve NMD work specifications.
- 6. The complete, consolidated set of all authorized specifications, references, and planning documents compiled in NMD for a specific ship's maintenance availability.
- 9. Request for Contract Change — A bilateral contracting document generated in NMD to authorize a change in the contract's scope, price, or schedule.