Across
- 2. before occupancy, ____-out off-gassed compounds & other contaminants left behind @ end of construction
- 5. ____ Efficiency (WE)
- 9. ____ materials cost. Cost of all materials used on-site. (including delivery and taxes but excluding labor)
- 12. ____ priority (RP)
- 16. ____ response. Encourage electricity users to decrease usage during peak demand times (tiered pricing or DR events)
- 17. ____ design (SD) explores several design options & alternatives w/ intent to establish layout & scope-of-work.
- 18. Agricultural sites.
- 20. ____ & Atmosphere (EA)
- 21. ____ Sites (SS)
- 22. US Environmental ____ Agency (EPA)
Down
- 1. ____ in Design (ID)
- 3. ____ thinking. Closed ____ are more sustainable. Negative vs. Positive feedback loops.
- 4. Intense workshop to produce specific deliverables for creative thinking.
- 6. ____ reuse. Practice of redesigning and using a structure for a use that is significantly different from the building's original use.
- 7. US Green ____ Council
- 8. The ____ bottom line. 1)Economic Prosperity 2)Environmental Stewardship 3)Social Responsibility
- 10. A systematic investigation by a skilled professional.
- 11. ____ & Resources (MR)
- 13. ____ materials cost. 45% of total construction costs. (add optional products such as furniture & MEP to that total)
- 14. Green ____ Certification Inc. (GCBI)
- 15. ____ Environmental Quality (EQ)
- 19. ____ & Transportation (LT)