PERMIT TO WORK

123456789101112131415
Across
  1. 3. Where can operational hazards easily be identified.
  2. 6. May cause contamination to product or product ingredients..........maintenance.(double red tick RMP).
  3. 7. Who is responsible for completing a Daily Audit.
  4. 8. PTW system protects ....... Product,Environment,Assets from adverse affects.
  5. 12. Only the Issuer(or designate) and Receiver can install or remove these.
  6. 13. What Isolation check must be completed and signed prior to permit authorisation and before work begins.
  7. 15. What attendance is required for the receivers supervision for a Category A. ( Pas 16 and above)
Down
  1. 1. How many levels of auditing are required for the PTW system.
  2. 2. Where can conflicts of work be easily identified.
  3. 4. When should the Estop only be used, in a ..............
  4. 5. Definition of the immediate surroundings and their constituent parts such as people,equipment,building,services,lighting,space,ventilation etc.
  5. 9. Hazard controls identified on a certificate must be included in the hazard controls on the ..........
  6. 10. What is the name of the Certificate all Electricians need to provide for changes and additions of Electrical systems.
  7. 11. Not limited too inadvertent operation of equipment or process, sudden release of pressure, temperature, chemical substances are all sources of ........
  8. 12. Who has the responsiblity of ensuring that the permit stations are kept stocked and tidy at all times.
  9. 14. Should not be used for an isolation.