Across
- 3. Where can operational hazards easily be identified.
- 6. May cause contamination to product or product ingredients..........maintenance.(double red tick RMP).
- 7. Who is responsible for completing a Daily Audit.
- 8. PTW system protects ....... Product,Environment,Assets from adverse affects.
- 12. Only the Issuer(or designate) and Receiver can install or remove these.
- 13. What Isolation check must be completed and signed prior to permit authorisation and before work begins.
- 15. What attendance is required for the receivers supervision for a Category A. ( Pas 16 and above)
Down
- 1. How many levels of auditing are required for the PTW system.
- 2. Where can conflicts of work be easily identified.
- 4. When should the Estop only be used, in a ..............
- 5. Definition of the immediate surroundings and their constituent parts such as people,equipment,building,services,lighting,space,ventilation etc.
- 9. Hazard controls identified on a certificate must be included in the hazard controls on the ..........
- 10. What is the name of the Certificate all Electricians need to provide for changes and additions of Electrical systems.
- 11. Not limited too inadvertent operation of equipment or process, sudden release of pressure, temperature, chemical substances are all sources of ........
- 12. Who has the responsiblity of ensuring that the permit stations are kept stocked and tidy at all times.
- 14. Should not be used for an isolation.