BCM

123456789101112
Across
  1. 1. The maximum amount of data loss an organization can tolerate, measured in time.
  2. 3. "____ Time Objective" (RTO): The target duration to restore a business process.
  3. 5. What you must do with a BCM plan to ensure it actually works.
  4. 10. The 'C' in BCM; ensuring the business keeps moving during a crisis.
  5. 12. The most important foundation during an event; keeping staff and clients informed.
Down
  1. 1. The ability of an organization to absorb a shock and keep operating.
  2. 2. A type of 'Workspace' used when the main office is inaccessible.
  3. 4. An event that causes a significant disruption to normal business functions.
  4. 6. What we measure to see how bad a disruption will be over time.
  5. 7. The period when a system or service is unavailable.
  6. 8. Acronym for the analysis used to identify the impact of a disruption (Business Impact Analysis).
  7. 9. A redundant copy of data kept at an off-site or cloud location.
  8. 11. The targeted duration of time within which a business process must be restored after a disaster or disruption in order to avoid unacceptable consequences