Across
- 5. _do not hold well in soft or muddy ground.
- 6. Rope splinters can be
- 8. What should you not do during construction?
- 9. manufacturer’s stated breaking strength.
- 10. _must be supervised at all times by an appropriate adult.
- 13. Who is responsible for inspecting and organising equipment?
- 15. Good poles should_?
- 18. The load must not be able to move outside the_of the base
- 19. Do not try to_heavy loads.
- 20. On Aerial bridges you should Prohibit bouncing or other_.
Down
- 1. What is the second step in planning a pioneering project?
- 2. As a general rule dismantle in_order to construction.
- 3. Always_ the level of experience and
- 4. by wearing gloves.
- 7. What type of frame is strongest?
- 11. How many people should be on a monkey bridge at a time.
- 12. A safe load for a Manilla rope should be_of
- 13. Check all knots and_before the project is used by anybody.
- 14. and numbers of the participants
- 16. Ensure a saftey_is appointed.
- 17. Equipment should be kept well_.