Pioneering Safety Policy

1234567891011121314151617181920
Across
  1. 5. _do not hold well in soft or muddy ground.
  2. 6. Rope splinters can be
  3. 8. What should you not do during construction?
  4. 9. manufacturer’s stated breaking strength.
  5. 10. _must be supervised at all times by an appropriate adult.
  6. 13. Who is responsible for inspecting and organising equipment?
  7. 15. Good poles should_?
  8. 18. The load must not be able to move outside the_of the base
  9. 19. Do not try to_heavy loads.
  10. 20. On Aerial bridges you should Prohibit bouncing or other_.
Down
  1. 1. What is the second step in planning a pioneering project?
  2. 2. As a general rule dismantle in_order to construction.
  3. 3. Always_ the level of experience and
  4. 4. by wearing gloves.
  5. 7. What type of frame is strongest?
  6. 11. How many people should be on a monkey bridge at a time.
  7. 12. A safe load for a Manilla rope should be_of
  8. 13. Check all knots and_before the project is used by anybody.
  9. 14. and numbers of the participants
  10. 16. Ensure a saftey_is appointed.
  11. 17. Equipment should be kept well_.