Piping Newsletter

12345678910111213141516
Across
  1. 7. This category of supports is primarily for tubing and should only be used for piping as a last resort
  2. 8. These physical interferences must be cleared before an isometric can be issued
  3. 9. Where model review comments are logged
  4. 10. What must you do to a PID prior to submitting an isometric to checking
  5. 11. In addition to Coreworx, this is one of the primary hubs of project documents
  6. 13. Software used to identify errors with isometrics
  7. 15. These interfaces at sheet breaks should be checked in the model and on the PID
  8. 16. Visual software used in model reviews and discipline coordination
Down
  1. 1. Located a low points, these allow liquids to be removed from a system
  2. 2. What should be submitted for C1 and C2 lines prior to sending an ISO to checking
  3. 3. A snapshot of this must be submitted with your isometric package for the first submission of a given revision
  4. 4. This document must be filled out for the initial submission of an isometric, but doesn't need to be resubmitted when submitting an ISO of the same revision from back draft
  5. 5. What aspect of insulation should be verified based on line list temperature data
  6. 6. A fresh version of this type of isometric must be submitted in addition to your fabrication ISO every time you advance an isometric package to checking
  7. 12. Located at high points, these allow gasses to be removed from a system
  8. 14. Software used to track design effort