Hillsboro NCMR Process

12345678910111213141516171819
Across
  1. 1. Porous foam material used between layers of adhesive; Transfills involving this require extra data verification
  2. 3. Document control number for the Hillsboro MRB Template slides
  3. 7. Upper or lower limits for the type of limit established
  4. 8. Material review board
  5. 10. __________ of Analysis
  6. 12. Use graph ________ to quickly identify and represent data trends
  7. 13. Confirming the hold was necessary in the first place
  8. 16. What drove the low yielding scenario?
  9. 17. The first step in processing an NCMR
  10. 19. Corrections, preventative actions, or path forward suggested with rationale
Down
  1. 2. If there are any uncertainties as to if MRB approval is needed, the NCMR should be presented to the MRB for disposition __________
  2. 4. The description of the issue accompanied with a visual representation
  3. 5. Offline engineering disposition
  4. 6. Minimum specifications that a pad has to pass to function as a product
  5. 9. Internal control specifications that we set for our products and are typically tighter than customer requirements
  6. 11. Tests with similar groupings of data collected
  7. 14. NCMR review and completion are done within the _________ material module in the ETQ Reliance system.
  8. 15. Immediate actions taken to prevent risk to other product(s)
  9. 18. How many month(s) of data is generally acceptable for control charts?