QIACube Robotic Workstation (Module V Part 3 of 3)

12345678910111213141516171819202122
Across
  1. 5. "Buffer AL should be checked for _________ before use."
  2. 7. All run and maintenance information tracking in digital logs are stored in the DNA _________ team.
  3. 9. After completion of preventive maintenance, or any other maintenance, a ______________ check must be performed.
  4. 10. "Internal surface area of the QIACube should be wiped each day before and after use with 70% ___________."
  5. 13. "Error messages are displayed as codes which can be found in the _____ _______."
  6. 14. Most common error encountered on the QIACube
  7. 16. Internal component of QIACube where rotor adapters are loaded and spun.
  8. 18. Internal component of the QIACube that holds solution bottles.
  9. 20. Internal component of the QIACube that closes the centrifuge
  10. 22. Internal component of the QIACube where samples are mixed.
Down
  1. 1. The most common reason for a "Load Check" error is due to a problem with reagent ___________.
  2. 2. Internal component of the QIACube that hold pipette tips.
  3. 3. Used pipettes are dispensed into the tip _________ slot of the QIACube.
  4. 4. The QIACube picks up with the addition of this reagent.
  5. 6. Maximum number of samples loaded onto the QIACube Robotic Workstation
  6. 8. "The QIACube tends to fail the the ________ _________ or final centrifugation steps.
  7. 11. Number of pipette tip rows on the QIACube Connect.
  8. 12. How often should the shaker and reagent racks of the QIACube be UV'ed?
  9. 15. How often does a Qiagen tech perform preventive maintenance?
  10. 17. "Each quarter, the monthly tasks should be performed. In addition, the __-____ must be changed along with cleaning of the centrifuge."
  11. 19. "A _________ test and cleaning of the robotic arm should be performed Monthly."
  12. 21. The run time for the QIACube is dependent on the number of _________.