QUALITY

1234567891011121314151617181920
Across
  1. 1. Aerospace management standard.
  2. 3. Integrated Business Management System.
  3. 5. Product that does not meet specification requirements.
  4. 6. Corrective Action – Preventive Action
  5. 7. ________ Action taken to eliminate the cause of non-conformities and potential non-conformities to prevent recurrence.
  6. 8. A document that is prepared by the Quality Engineer and serves to define the way the program will maintain quality, including coverage of every customer requirement and how those requirements are maintained.
  7. 10. Methods of improving the suitability, adequacy, and effectiveness of the Quality Management System: ___________________ Improvement.
  8. 12. Quality Management System.
  9. 16. First Article Inspection (Report) - A planned, complete, independent, and documented inspection and verification process to ensure that prescribed production processes have produced an item conforming to all the requirements.
  10. 18. Action on a nonconforming product or service to make it conform to the requirements.
  11. 19. Quality _________ System (QMS) is a collection of business processes focused on consistently meeting customer requirements and enhancing their satisfaction.
  12. 20. Failure Review Board.
Down
  1. 2. A detailed description of the design and materials to make something.
  2. 4. The steps taken to resolve a nonconformance.
  3. 9. A document that captures all the requirements for the program per RFQ, SOW, Contract / Purchase Order, and referenced documents.
  4. 11. Who is responsible for Quality?
  5. 13. One of the 6-S techniques.
  6. 14. Quality Assurance Clause.
  7. 15. Authorization to determine the appropriate disposition for a defective item.
  8. 17. Root Cause Corrective Action: Effective, robust, disciplined problem-solving methods applied to identify the underlying cause of problems or events.