Railway Nerds

123456789101112131415161718192021
Across
  1. 3. last station at the west of PTW2
  2. 5. permission to clear a route from another box
  3. 7. number of trains per hour on the valley lines 2024
  4. 8. number of filaments in an SL35 lamp
  5. 10. signals face both ways
  6. 13. used to cross a valley
  7. 15. level crossing at the end of a platform
  8. 16. body used for competency management
  9. 17. mechanical signal
  10. 18. the rules of signalling design
  11. 20. old fashioned version of a button
  12. 21. control for checking a call on is viable
Down
  1. 1. when the full overlap is not available
  2. 2. the part you protect from a side on collision
  3. 4. timing circuit used where different systems meet
  4. 6. first station of the cornwall project
  5. 9. what yellow is for cars
  6. 11. the centre of the safety system
  7. 12. an item exchanged with a signaller
  8. 14. a bent post
  9. 19. colour used in ATP signalling