Across
- 3. Abbr. for Residential Energy Customer Operations
- 4. The name of your department manager.
- 5. Also known as a rebate
- 8. Three types of incentives are _________, Performance Based, and tax credits.
- 10. The second step in a 2-step interconnection process
- 11. The process of connecting a utility's grid network with equipment that doesn't belong to them
- 12. The Project ___________ is responsible for obtaining scope of work and quotes on any preconstruction work called out for a job.
Down
- 1. History This is always require for us to determine offset amount. Typically found on the utility bill.
- 2. The name of the software program used where customers place their orders for energy products
- 6. The Grid tool where pricing is listed in detail for each design option a customer has ever been given.
- 7. The Project ___________ is responsible for communicating with our customers from Order to Activation.
- 9. Abbr. for a utility policy that allows consumers to transfer energy produced by their solar system to the utility grid in exchange for credits
- 10. This is always required on every job in order for us to install solar.
- 13. Abbr. for the local city or state office that provides permits and inspections.