Across
- 2. High _______ PPE is required in all Dock areas
- 3. Be aware of any potential _____ Points in your work area
- 7. In case of an _______________Dial x2222
- 8. Refer to the Process PPE ________ for the Proper PPE
- 11. Maintain Good 5s on process. If you drop a part, ____it up
- 13. If caught early, an injury can be prevented through the _____ System
- 14. Use the correct tool for task at hand. Always confirm tools are in _____ working condition
- 15. When in any abnormal situation Stop-Call- and __________!
- 19. Enter all safety concerns into the Safety Concern_
- 20. Never rush on process and utilize your _____ when needed
- 21. Never remove ___________or any other safety equipment from a machine or tool
- 22. Report any________ conditions to your GL immediately.
Down
- 1. Utilize designated Pedestrian __________ when traveling through plant
- 4. You can reduce your chances of potential injury by stretching daily and using ____ for soreness
- 5. GIR(Global _____ Rate) is an acute Injury resulting from a single traumatic event
- 6. Make sure that proper_________ procedure is utilized when working on equipment
- 9. The #1 cause of failed ESI's is late __________
- 10. COHE Stands for Control of ___________Energy
- 12. ____________ type of injury develops over a period of time
- 16. Use Your _______Eye to spot safety hazards
- 17. Always follow __________ work and Safety key points
- 18. Always put _____ First!
