SE QUIZ

1234567891011121314151617181920
Across
  1. 1. ... integration testing has as it's major advantage(s) that major decision points are tested early.
  2. 5. If a software have these characteristics observability, Simplicity, Stability. Then the software is called ... Software.
  3. 6. The testing technique that requires devising test cases to demonstrate that each program function is operational is called.
  4. 7. ... tests are normally conducted by the end user.
  5. 11. ... testing should be a normal part of integration testing because as a new module is added to the system new control logic is invoked and data flow paths are established.
  6. 12. ... and ... are not needed for unit testing because the modules are tested independently of one another.
  7. 13. ... Black-box testing attempts to find errors.
  8. 15. The normal order of activities in which traditional software testing is organized are: Unit, Integration, System and ... Testing.
  9. 18. ... integration testing has as it's major advantage(s) that no stubs need to be written.
  10. 19. What type of errors are missed by black-box testing and can be uncovered by white-box testing?
  11. 20. The ... complexity metric provides the designer with information regarding the number of independent logic paths in the program.
Down
  1. 2. The testing technique that requires devising test cases to exercise the internal logic of a software module is called.
  2. 3. ... is not testing, but always occurs as a consequence of testing.
  3. 4. ... maintenance is most expensive and time consuming
  4. 8. ... is an approach to debugging?
  5. 9. Black-box testing attempts to find errors.
  6. 10. The focus of ... testing is to uncover places that a user will be able to observe faults in a module of the software.
  7. 14. WHITE box testing sometimes called ... Testing.
  8. 16. ... testing is a control structure testing technique where the criteria used to design test cases is that they select test paths based on the locations and uses of variables.
  9. 17. ... is a level names in the Capability Maturity Model