Across
- 2. Japanese word, which means "making of things"
- 3. One of the Vital 4 that supports role specific training
- 4. A continuous improvement tool
- 9. Complete cost of vehicle or powertrain when it leaves the plant
- 10. Area to track projects and priorities
- 11. Provides structured approach to TPC reduction through concept of Waste and Losses
Down
- 1. Never Receive, Never Produce, Never Pass a Defect
- 5. Methodology evaluates similar components costs to identify savings
- 6. The “first” technical domain
- 7. The plan to create a real breakthrough, drive performance and achieve success through aggressive targets
- 8. Systematic improvement of work stations
