Across
- 5. Where parts of the business switch over to the new system and the old system is maintained in critical areas
- 6. The analyst will create a ________________ specification which details what should be included in the new system
- 8. Once the system has been developed it must be __________
- 9. System _______________ are created as part of the requirements specification
- 10. This is a guide showing how to use the system
- 15. This is required for users as part of the implementation stage
- 16. This is required for updating a program to correct faults or improve features
- 18. The Systems Life Cycle is a _______ of steps which occur during the development of a new ICT system
- 19. Before a system can be tested a test _________ must be written
- 20. This stage of the SLC is the creates a specification of all software, hardware, data files and test plans
Down
- 1. A ___________ system is a process that does not involve computers
- 2. The analyst will follow the path that information takes from the point it enters the system, how it is processed and what outputs are created. This is called a ___________ trail
- 3. This is the stage where the system code is written and the system developed
- 4. During the investigation stage, the analyst will ask the ________ of the new system what they want it to be able to do
- 7. Once the analyst has found out that a new system is needed, they will conduct a ____________ study to determine whether it would be possible to develop it
- 11. This is part of the implementation stage
- 12. During this stage the key members of the project will get together to consider whether the project was a success and what lessons can be learned
- 13. The installation method where one system is switched off and the new system is turned on
- 14. During the investigation stage, the analysis will ____________ a small number of selected users
- 17. The stage where the system requirements and user interface are specified
