2018_SSO_FIT na ako (kita moh?!) crossword puzzle

1234567891011121314151617181920
Across
  1. 4. Refers to market based policy that requires electricity suppliers to source an agreed portion of their energy supply from eligible RE resources.
  2. 7. To understand our stakeholders and how we deal with them, we identify the degree of their ________on us.
  3. 8. What is the electrical equipment that is used to isolate an electrical circuit offline?
  4. 11. Primary agency responsible for the conservation, management, development, and proper use of the country's environment and natural resources.
  5. 13. Capacity that normally operates to take all or part of the minimum load of a system, and which consequently produces electricity at an essentially constant rate and runs continuously.
  6. 15. Document issued by DENR/EMB after a positive review of the application, certifying that based on the representations of the proponent, the proposed project or undertaking will not cause significant negative environmental impact.
  7. 19. A mathematical representation of the power system, which will be used for the purpose of determining dispatch schedules and energy prices, and preparing market projections
  8. 20. Section in the EIS that details the prevention, mitigation, compensation, contingency and monitoring measures to enhance positive impacts and minimize negative impacts and risks of a proposed project or undertaking.
Down
  1. 1. It is an energy from an alternative source delivered by Supplier to Customer during a Force Majeure Event.
  2. 2. To understand our stakeholders and how we deal with them, we identify the degree of their ________on us.
  3. 3. What is the electrical equipment that will open and close an electrical circuit during operation or online?
  4. 5. Process of building, enhancing and protecting relationships in order to build goodwill, support and grow the business and brand.
  5. 6. A period during which Supplier or Customer may undertake scheduled or planned inspection, maintenance, repair and overhaul of the Power Plant or the Customer Facility.
  6. 9. A measure in varhours (varh) of the alternating exchange of stored energy in inductors and capacitors, which is the time integral product of voltage and the quadrature component of current flow across a connection point.
  7. 10. Process that involves evaluating and predicting the likely impacts of a project (including cumulative impacts) on the environment during construction, commissioning, operation and abandonment.
  8. 12. Person or group who has a direct interest or is directly affected by the win or loss of an action or decision or has a shared aspirations to you.
  9. 14. Is the gradual increase of overall temperature of EARTH’s atmosphere.
  10. 16. In executing an engagement plan, the I.F.E.R concept has an important role in building what?
  11. 17. The ratio of Active Power to Apparent Power.
  12. 18. Refers to the high voltage backbone system of interconnected transmission lines, substations and related facilities located in each of Luzon, Visayas and Mindanao or as may otherwise be determined y the ERC in accordance with RA 9136.