Across
- 3. Name of the assembly manager
- 5. System pillar focused on "only what's needed."
- 6. Core operational problem: Supplier scheduling
- 8. Toyota's system for eliminating waste.
- 9. Waste product that piled up in overflow parking.
Down
- 1. System practice requiring immediate shutdown upon defect.
- 2. Concept of leveling the production schedule
- 4. Japanese term for continuous improvement
- 7. Kentucky city with the troubled Toyota plant.
