TPS

123456789
Across
  1. 3. Name of the assembly manager
  2. 5. System pillar focused on "only what's needed."
  3. 6. Core operational problem: Supplier scheduling
  4. 8. Toyota's system for eliminating waste.
  5. 9. Waste product that piled up in overflow parking.
Down
  1. 1. System practice requiring immediate shutdown upon defect.
  2. 2. Concept of leveling the production schedule
  3. 4. Japanese term for continuous improvement
  4. 7. Kentucky city with the troubled Toyota plant.