TYPE A MODULE 6

12345678910
Across
  1. 2. A method combining distance and flow to estimate cost.
  2. 5. Movement frequency of materials.
  3. 8. The cost per movement between facilities.
  4. 9. Distance A method measuring max horizontal or vertical distance.
  5. 10. The cost used in FTC calculation.
Down
  1. 1. A chart showing quantity of material movement.
  2. 3. The space between two departments.
  3. 4. A factor affecting efficiency of production flow.
  4. 6. A diagram showing layout of departments.
  5. 7. Equipment used to move materials.